Expansion and refurbishment of the Red Deer Regional Hospital Centre. The project will add 200 new in-patient beds added, increasing hospital capacity from 370 beds to 570 beds. Additionally, there will be 6 new operating rooms (ORs), and 2 cardiac catheterization labs added.The project will also enhance the Medical Device Reprocessing Department, add a new central power plant, renovate the existing building, and add a new ambulatory services building.
Expansion and refurbishment of the Red Deer Regional Hospital Centre. The project will add 200 new in-patient beds added, increasing hospital capacity from 370 beds to 570 beds. Additionally, there will be 6 new operating rooms (ORs), and 2 cardiac catheterization labs added.
The project will also enhance the Medical Device Reprocessing Department, add a new central power plant, renovate the existing building, and add a new ambulatory services building.